BearPaw-Tacoma Pass Regrade #1

Project dates: 8/2/2019 - 8/4/2019
Region:
Project type:
Volunteer group: North 350 Blades
Agency: Okanogan-Wenatchee National Forest: Cle Elum RD
Crew leader Jack Jensen
Elevation (ft) 4726
Project description: This project is a continuation of the trailwork done over the last 2 years (CC100 Crew) in this location. The intent is to do a complete regrade of a bounded section starting at BearPaw Butte and continuing down to Tacoma Pass. This is a multi-year project. It's all dirt work but it should be easy and fun. The walk from camp to the work site will be short. Primarily we'll be widening the trail back to standard width. The area is a mix of old-growth and 2nd-growth timber, and elevation change is minimal in this area. This has been a fun project the last 2 years, so expect to have a good time with good food.
Previous trail maintenance experience required: No
Fitness level: Moderate: This project is suitable for individuals in good physical condition who participate in a semi-exercise routine. Most people who are physically active can participate at this level. The components of this project may include one or more of the following: hiking 1-5 total miles each day, elevation change of 1000 ft or less over the course of the hike, and moderately physical work activities.
Total hiking miles per day: 1
Maximum number of volunteers: 15
High Clearance Vehicle Required: No
Camping type:
Camping notes: Mountain weather is unpredictable so be prepared for rain, but weather in the first part of August is usually warm and dry.
Contact/how to register: Contact [email protected].